2760 Sheffield — development project
This industrial project (site plan control) at 2760 Sheffield, in the Industrial East neighbourhood (Ward 18 district), has been the subject of 2 applications before City of Ottawa's development-application process between 2023-05-24 and 2024-11-28. Status: under review — latest status: Signed Letter of Undertaking Received. Application types: Site Plan Control.
Filing history (2)
2024-11-28 — Site Plan Control
· Signed Letter of Undertaking Received (D07-12-24-0156)
2023-05-24 — Site Plan Control
· Receipt of Letter of Undertaking from Owner Pending (D07-12-23-0065)
The applicant submitted a Site Plan Control application to construct a 10,564 m2 multi-tenant warehouse with 37 loading bays and 126 surface parking spaces.
Other projects in Industrial East
Zoning By-law Amendment, Site Plan Control
The City of Ottawa received a Zoning By-law Amendment and Site Plan Control application to construct an industrial facility for the outdoor storage, servicing, and refueling of Miller Waste fleet vehicles and storage bins.
A Site Plan Control application to construct one new industrial building, with a total gross floor area of 3,100 square metres.
Proposal to construct addition to the existing 2-storey medium manufacturing facility at 2700 Swansea Crescent, approximately 1,540SM large and will be constructed above the parking lot as on addition to the south side of the second story of the existing facility. The purpose of this addition is to provide more research and office space and to expand current operations. No change to the existing site access is proposed, and the parking ls not significantly altered.
Zoning By-law Amendment
Site Plan Control
Site Plan Control
Zoning By-law Amendment