2555 Marchurst — development project
This industrial project (zoning by-law amendment) at 2555 Marchurst, in the Carp neighbourhood (Ward 5 district), has been the subject of 1 application before City of Ottawa's development-application process at its 2025-07-14 meeting. Status: advancing — latest status: Zoning By-law in Effect. Application type: Zoning By-law Amendment.
Data last refreshed · The data
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (1)
2025-07-14 — Zoning By-law Amendment
· Zoning By-law in Effect (D02-02-25-0050)
The City of Ottawa has received a Zoning By-law Amendment application to facilitate the development of a Battery Energy Storage System (BESS) facility at 2555 and 2625 Marchurst Road proposing 256 BESS containers, a substation, a stormwater pond, a transmission line connection, a noise wall, with an access from Marchurst Road.
Other projects in Carp
A zoning by-law amendment is being requested for this property to permit development in accordance wirh its official Plan designation of village. The residential portion of the site is proposed to be re-zoned to village residential first denisty zone for singe detached dwelling units and village residential third denisty zone for the semi-detached and townhouse dwllings units The propsed pathway blocks are proposed to be re-zoned to parks and open space 01
62 rural lots together with 2 open space/park blocks, 3 blocks for public access and 3 commercial/industrial blocks.
Plan of Subdivision
The City of Ottawa has received a minor Zoning By-law Amendment to permit an increase in the maximum floor area for an accessory building from 55m2 to 70m2 and to permit an increase in height from 11m to 12m for the apartment building. This application will also consider removal of the holding provision affecting the site regarding available servicing capacity. 39 apartment units.
39 Unit Residential Apartment
Site Plan Control
Site Plan Control
Site Plan Control