New construction & development in Vanier North, Ottawa

15
projects tracked
457
proposed units
12
advancing
2026-10-15
latest activity

As of 2026-10-15, 15 development projects have been reviewed by City of Ottawa's development-application process in the Vanier North area, totalling 457 proposed housing units. The largest is a 282-unit residential project at 200 Baribeau. 0 are new builds, and 12 are currently advancing. Use types: 5 residential, 1 commercial, 1 institutional.

Data last refreshed · The data

Recent activity

To permit the existing Community Centre as a land use
institutionalunder review
Zoning By-law Amendmentlatest activity 2026-10-151 filing(s) project page file D02-02-26-0080
The City of Ottawa has received a Zoning By-law Amendment application to permit the land uses of "animal hospital", "animal care establishment", "retail store", "training centre" and "retail food store" within the existing building to facilitate the development of an Animal Welfare Hub.
commercialadvancing
Zoning By-law Amendmentlatest activity 2025-10-061 filing(s) project page file D02-02-25-0073
City-initiated. The City of Ottawa has initiated a Zoning By-law Amendment application to facilitate the construction of a new residential development consisting of up to nine (9) residential use buildings with a maximum total of 282 units. The proposal also includes a surface parking lot as well as an expansion to the St. Ambroise Park.
282 unitsresidentialadvancing
Zoning By-law Amendmentlatest activity 2025-07-232 filing(s) project page file D02-02-25-0052
It is proposed to develop a four-storey apartment building on the subject site. The proposed building will contain a total of 41 units, with five studio units, 26 one-bedroom units, eight two-bedroom units, and two three-bedroom units.
41 units4 storeysresidentialadvancing
Site Plan Control, Zoning By-law Amendmentlatest activity 2024-12-232 filing(s) project page file D07-12-24-0177
The City of Ottawa has received a Zoning By-law Amendment and Site Plan Control application to permit the construction of a low-rise apartment building consisting of 18 dwelling units. No vehicle parking is proposed; however, 10 bicycle parking spaces will be provided in a dedicated parking room at grade.
18 unitsresidentialadvancing
Site Plan Control, Zoning By-law Amendmentlatest activity 2023-03-312 filing(s) project page file D07-12-23-0038

Projects (15)

City-initiated. The City of Ottawa has initiated a Zoning By-law Amendment application to facilitate the construction of a new residential development consisting of up to nine (9) residential use buildings with a maximum total of 282 units. The proposal also includes a surface parking lot as well as an expansion to the St. Ambroise Park.
282 unitsresidentialadvancing
Zoning By-law Amendmentlatest activity 2025-07-232 filing(s) project page file D02-02-25-0052
A Site Plan Control application to construct a Planned Unit Development (PUD) consisting of 94 townhouse dwellings, each including a main unit and two accessory dwelling units. The site also includes a centralized parking area, a centralized garbage facility and bicycle storage, as well as an increased expansion of St. Ambroise Park.
94 unitsresidentialadvancing
Site Plan Controllatest activity 2020-09-041 filing(s) project page file D07-12-20-0118
It is proposed to develop a four-storey apartment building on the subject site. The proposed building will contain a total of 41 units, with five studio units, 26 one-bedroom units, eight two-bedroom units, and two three-bedroom units.
41 units4 storeysresidentialadvancing
Site Plan Control, Zoning By-law Amendmentlatest activity 2024-12-232 filing(s) project page file D07-12-24-0177
the development proposes a new 3.5 storey apartment building with 22 rental units and a covered parking area at the rear of the building.
22 units4 storeysresidentialadvancing
Site Plan Controllatest activity 2014-04-241 filing(s) project page file D07-12-14-0078
The City of Ottawa has received a Zoning By-law Amendment and Site Plan Control application to permit the construction of a low-rise apartment building consisting of 18 dwelling units. No vehicle parking is proposed; however, 10 bicycle parking spaces will be provided in a dedicated parking room at grade.
18 unitsresidentialadvancing
Site Plan Control, Zoning By-law Amendmentlatest activity 2023-03-312 filing(s) project page file D07-12-23-0038
To permit the existing Community Centre as a land use
institutionalunder review
Zoning By-law Amendmentlatest activity 2026-10-151 filing(s) project page file D02-02-26-0080
The City of Ottawa has received a Zoning By-law Amendment application to permit the land uses of "animal hospital", "animal care establishment", "retail store", "training centre" and "retail food store" within the existing building to facilitate the development of an Animal Welfare Hub.
commercialadvancing
Zoning By-law Amendmentlatest activity 2025-10-061 filing(s) project page file D02-02-25-0073
Demolition Control, Site Plan Control
otherunder review
Demolition Control, Site Plan Controllatest activity 2021-10-272 filing(s) project page file D07-12-21-0175
Zoning By-law Amendment
otheradvancing
Zoning By-law Amendmentlatest activity 2021-10-061 filing(s) project page file D02-02-21-0114
City-initiated Council approved Demolition of structure at 309 Montfort
otheradvancing
Demolition Controllatest activity 2021-06-291 filing(s) project page file D07-05-21-0005
Site Plan Control
otheradvancing
Site Plan Controllatest activity 2021-06-281 filing(s) project page file D07-12-21-0093
Site Plan Control
otheradvancing
Site Plan Controllatest activity 2020-12-211 filing(s) project page file D07-12-20-0186
Site Plan Control
otheradvancing
Site Plan Controllatest activity 2020-08-131 filing(s) project page file D07-12-20-0109
The two-storey detached dwelling is proposed to be demolished due to its derelict state. The City of Ottawa issued an Order under the Property Standards Bylaw on May 11, 2017, instructing the owners to obtain a building permit in order to do the required repairs. The Order identifies evidence of deterioration and damage to walls, settlement of walls as well as broken windows, and requires that the owner provide a report by a licenced professional structural engineer as to the structural integrity of the entire building. Due to the eventuality of the site being redeveloped, the owner prefers to demolish the building.
otherunder review
Demolition Controllatest activity 2018-02-161 filing(s) project page file D07-05-18-0002
Site Plan Control
otheradvancing
Site Plan Controllatest activity 2017-06-161 filing(s) project page file D07-12-17-0077