360, boulevard Saint-Joseph — development project
This residential project (new construction) at 360, boulevard Saint-Joseph, in the Lac-des-Fées neighbourhood (Parc-de-la-Montagne-Saint-Raymond district), has been the subject of 5 applications before Gatineau's planning advisory committee (CCU) between 2024-05-13 and 2025-10-20. It proposes 345 housing units over 10 storeys. Status: advancing — latest CCU decision: recommended. Application types: PIIA, usage conditionnel, dérogation mineure, PPCMOI.
Data last refreshed · The data
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (5)
2025-10-20 — PPCMOI
· recommended (R-CCU-2025-10-20/121)
Construire un bâtiment comportant 307 logements
2025-10-20 — usage conditionnel
· recommended (R-CCU-2025-10-20/122)
Construire un bâtiment comportant 307 logements
2024-05-13 — PIIA
· recommended (R-CCU-2024-05-13/85)
Construire un bâtiment mixte de 10 étages (phase 1)
2024-05-13 — usage conditionnel
· recommended (R-CCU-2024-05-13/86)
Construire un bâtiment mixte de 10 étages (phase 1)
2024-05-13 — dérogation mineure
· recommended (R-CCU-2024-05-13/87)
Construire un bâtiment mixte de 10 étages (phase 1)
Other projects in Lac-des-Fées
Construire une habitation multifamiliale comportant 11 logements
Construire une habitation multifamiliale
Régulariser la construction d’une habitation multifamiliale de neuf logements
Construire deux habitations multifamiliales comportant quatre logements
Construire une habitation de type collectif comportant neuf chambres
Agrandir une habitation bifamiliale et la transformer en habitation trifamiliale
Agrandir une habitation bifamiliale
Installer une enseigne de type babillard électronique