349, 357 et 359 (355 N.O.), boulevard Alexandre-Taché — development project
This residential project (new construction) at 349, 357 et 359 (355 N.O.), boulevard Alexandre-Taché, in the Du Parc neighbourhood (Manoir-des-Trembles-Val- district), has been the subject of 3 applications before Gatineau's planning advisory committee (CCU) at its 2026-06-22 meeting. It proposes 161 housing units over 6 storeys. Status: under review — latest CCU decision: deferred. Application types: PPCMOI, PIIA, usage conditionnel.
Data last refreshed · The data
Location & nearby projects
● this project · ○ nearby projects — click a dot to open its page
Filing history (3)
2026-06-22 — PPCMOI
· deferred
Construire un bâtiment résidentiel d’une hauteur variant de 3 à 6 étages
2026-06-22 — PIIA
· deferred
Construire un bâtiment résidentiel d’une hauteur variant de 3 à 6 étages
2026-06-22 — usage conditionnel
· deferred
Construire un bâtiment comportant un maximum de 161 logements
Other projects in Du Parc
Construire une habitation multifamiliale isolée de 7 étages comprenant 189 logements
Agrandir un bâtiment résidentiel permettant l’ajout d’une construction de 8 étages comptant 169 logements
Construire une habitation multifamiliale de 5 étages comportant 33 logements abordables
Transformer une habitation bifamiliale en habitation trifamiliale
Agrandir un bâtiment principal
Construire une résidence d’étudiants
Agrandir une habitation unifamiliale
Remplacer le revêtement extérieur dans un projet résidentiel intégré